|
Conditions of the installation service for above ground pools GRE
|
The assembly of the pool will be carried out by a Gre Official Technical Service (SAT), with qualified personnel and specialists in the installation of steel pools.
|
The mounting surface must be even, firm, smooth and completely level.
|
The Installation Service does NOT include:
|
• Land preparation.
• In pools with buried beams, the ditches to bury the beams are not included, nor is the soil necessary for their subsequent filling.
• Transportation of water to the pool.
• Connection of electrical current to the swimming pool.
• Varnished (in wooden pools).
|